H&M Covent Garden

the challenge

  • Our client has a flagship facility in central London and occupies a strong position in the very highly competitive retail clothing sector.
  • Increased building and upgrade work in the area meant that power supply and quality had deteriorated.
  • The shop design was very energy efficient with modern equipment and LED lighting keeping the loads to a manageable level.
  • The shop itself is to open seven days per week.

the solution

  • 65 Kva 3 phase modular Uninterruptible Power Supply and a built-in bypass function to allow for maintenance.
  • N+1 modular solution to keep absolute certainty of supply.
  • Lead acid battery to give a full one-hour standby at full load to allow any backup generators to be engaged.
  • System control.
  • Battery rack.
  • Cables and accessories.
  • Installation and commissioning.